Parliament UK

Primary navigation

Mr Barry's War

Mr Barry's War
When the brilliant classical architect Charles Barry won the competition to build a new, Gothic, Houses of Parliament in London he thought it was the chance of a lifetime. It swiftly turned into the most nightmarish building programme of the century. From the beginning, its design, construction and decoration were a battlefield. The new Palace of Westminster had to be built on acres of unstable quicksand, while the Lords and Commons carried on their work as usual. Its river frontage needed to be constructed in the treacherous currents of the Thames. Its towers were so gigantic they required feats of civil engineering and building technology never used before. And the interior demanded spectacular new Gothic features not seen since the middle ages. It took twenty-five years for Barry to achieve victory with his 'Great Work' in the face of overwhelming odds, and at great personal cost. Mr Barry's War takes up where its prize-winning prequel The Day Parliament Burned Down left off, telling the story of how the greatest building programme in Britain for centuries produced the world's most famous secular cathedral to democracy.
 
Our Price£23.00
Retail Price£25.00
Code9780198707196
AuthorCaroline Shenton
BindingHardback
Publisher:OUP
Pub. Date08/09/2016
In stock. Normally despatched on the same working day
 
No reviews

 

Save wishlist

When the brilliant classical architect Charles Barry won the competition to build a new, Gothic, Houses of Parliament in London he thought it was the chance of a lifetime. It swiftly turned into the most nightmarish building programme of the century. From the beginning, its design, construction and decoration were a battlefield. The practical and political forces ranged against him were immense. The new Palace of Westminster had to be built on acres of unstable quicksand, while the Lords and Commons carried on their work as usual. Its river frontage, a quarter of a mile long, needed to be constructed in the treacherous currents of the Thames. Its towers were so gigantic they required feats of civil engineering and building technology never used before. And the interior demanded spectacular new Gothic features not seen since the middle ages. Rallying the genius of his collaborator Pugin; flanking the mad schemes of a host of crackpot inventors, ignorant busybodies and hostile politicians; attacking strikes, sewage and cholera; charging forward three times over budget and massively behind schedule, it took twenty-five years for Barry to achieve victory with his 'Great Work' in the face of overwhelming odds, and at great personal cost. Mr Barry's War takes up where its prize-winning prequel The Day Parliament Burned Down left off, telling the story of how the greatest building programme in Britain for centuries produced the world's most famous secular cathedral to democracy.
No recommended products at the moment.
 
HoC Luxury Chocolates 250g
Our Price: £11.50

click to see more

 
 
HoC Mug Portcullis Cropped
Our Price: £6.95

click to see more

 
 
Notebook Recycled Leather
Our Price: £9.95

click to see more

 
 
House of Commons Tea in a Tin
Our Price: £5.95

click to see more

 
 
Ballpoint Pen HoC
Our Price: £12.95

click to see more

 

Footer links